Google purchases nuclear energy from Kairos Power SMRs

1 point by espadrine 8 months ago | 2 comments
  • espadrine 8 months ago
    Five years to build each SMR is faster than what it takes to build a typical EPR (from 10 to 20 years), but it is still longer than what I expected. Besides, the 5-year figure might have overruns as they work through regulatory hoops towards a permit.

    Nevertheless, before even having one built, it will allow Google to say that large model training will eventually not produce CO2.

    • brudgers 8 months ago