Google purchases nuclear energy from Kairos Power SMRs
1 point by espadrine 8 months ago | 2 comments- espadrine 8 months agoFive years to build each SMR is faster than what it takes to build a typical EPR (from 10 to 20 years), but it is still longer than what I expected. Besides, the 5-year figure might have overruns as they work through regulatory hoops towards a permit.
Nevertheless, before even having one built, it will allow Google to say that large model training will eventually not produce CO2.
- brudgers 8 months ago